logo
  SEARCH ENGINES
  GO


  THE DIVISIONS
  * POWER
power
  * AEROSPACE
aerospace
  * OPTO
opto
  * RF
rf
  * MAGNATEC
magnatec
 
ESA Chart III Burn-In and Electrical

    Components from Final Production Test   Testing Levels
      B C
Para 9.95   Verification of Safe Operating Area   Y Y
         
Para 9.9.1   Parameter Drift Value
(Initial Measurement for HTRB)
  Y -
         

Para 7.71 (a)
Para 9.22

  High Temperature Reverse Bias Burn-in   Y Y
         
Para 9.9.1   Parameter Drift Value
(Final Measurement for HTRB,
Initial Measurement for Burn-In)
  Y -
         
Para 9.9.2   Burn-in 168 Hours   Y Y
         
Para 9.9.1   Parameter Drift Value
(Final Measurement for Burn-In)
  Y -
         
Para 9.9.2   Electrical Measurements - High & Low temp   Y Y
         
Para 9.9.3   Electrical Measurements - Room temp (3)   Y Y
         
Para 9.12   Radiographic Inspection (1) (2)   Y -
         
Para 9.9.8.1/2   Seal Test (Fine & Gross Leak)   Y Y
         
Para 9.10   External Visual Inspection   Y Y
         
Para 7.4   Check for Lot failure   Y Y
         
    To Chart IV
To Chart V
     
 
  1. Radiographic inspection may be performed at any point during the test sequence shown in this chart.
  2. Radiographic inspection rejects not to be counted for lot failure.
  3. Measurement of parameters for the purpose of drift value measurements need not be repeated for electrical measurements at room temperature.
1   PRODUCT LINES
2   TECHNOLOGIES
3   SCREENING &
  QUALIFICATIONS